Passive House certification sets a demanding performance target for the complete building, and the external envelope has a central role in achieving it. In the…
Posts
Selecting a facade panel system affects far more than the appearance of a building. The choice influences thermal performance, moisture control, fire safety,…
A cladding project involves far more than fixing panels to a building. The external envelope must manage weather, movement, fire performance, thermal…
A building’s facade continues to communicate after sunset. Carefully positioned light can reveal entrances, define circulation, support wayfinding, and give a…
Steel frame buildings provide speed, strength, and flexibility, but their high thermal conductivity creates a significant risk at the building envelope. When…
Early contractor involvement in facade design gives developers, architects, and main contractors access to practical construction knowledge before key…
Fire performance is a central consideration when selecting an external wall system for a new building, refurbishment, or recladding project. In the UK, BS 8414…
Roofing and cladding are closely connected elements of a building envelope, yet they are often procured and installed as separate work packages. If their…
Glass performance has a direct influence on energy use, occupant comfort, daylight, appearance, and the long-term operation of a building. The coating applied…
Defective cladding panels can disrupt a construction programme long before they reach the elevation. Scratches, dents, delamination, colour variation,…