Posts

Designing Cladding for Passive House Certification in the UK

Passive House certification sets a demanding performance target for the complete building, and the external envelope has a central role in achieving it. In the…

Choosing The Right Panel System For A Building Envelope

Selecting a facade panel system affects far more than the appearance of a building. The choice influences thermal performance, moisture control, fire safety,…

The Role of a Clerk of Works on a Cladding Project

A cladding project involves far more than fixing panels to a building. The external envelope must manage weather, movement, fire performance, thermal…

Trespa Illuminated Facade Panels for Night-Time Architecture

A building’s facade continues to communicate after sunset. Carefully positioned light can reveal entrances, define circulation, support wayfinding, and give a…

How To Fix Cladding To Steel Frame Buildings Without Thermal Bridging

Steel frame buildings provide speed, strength, and flexibility, but their high thermal conductivity creates a significant risk at the building envelope. When…

Early Contractor Input For Better Facade Design

Early contractor involvement in facade design gives developers, architects, and main contractors access to practical construction knowledge before key…

Understanding BS 8414 Fire Testing for Cladding Systems

Fire performance is a central consideration when selecting an external wall system for a new building, refurbishment, or recladding project. In the UK, BS 8414…

How To Schedule Roofing And Cladding Works Without Delays

Roofing and cladding are closely connected elements of a building envelope, yet they are often procured and installed as separate work packages. If their…

Soft Coat And Hard Coat Glazing Explained For Building Projects

Glass performance has a direct influence on energy use, occupant comfort, daylight, appearance, and the long-term operation of a building. The coating applied…

How to Handle Defective Panels Delivered to Site

Defective cladding panels can disrupt a construction programme long before they reach the elevation. Scratches, dents, delamination, colour variation,…